The Banjulinding structure at full height, its concrete frame and floor slabs cast and the walls rendered, with a balcony to each upper floor.
Built 2025

Banjulinding

Residential and commercial, Banjulinding

Buildings 2
Residential block 300 m² over two storeys
Commercial block 308 m² over two storeys
Total floor area 608 m²
Our role Subcontractor
Our scope Foundations and superstructure
Main contractor GIGO Construction
Completed 2025

Two buildings in Banjulinding, completed in 2025: a two-storey residence of 300 m² and a two-storey commercial building of 308 m².

Golden Head Innovates was engaged as subcontractor for the foundations and the full superstructure — everything above ground level, including frame, floor slabs, blockwork and balconies.

The structure

The front of the two-storey house at night, its stone-clad external walls lit from below.
Next project

Jalambang

A six-bedroom house in Jalambang, completed in 2022 and taken from first drawing to handover of keys.